3M 303
Terms
undefined, object
copy deck
- WHAT'S THE ANOTHER NAME FOR THE 3M MANUAL?
- 4790.4D
- WHAT DOES CDM STAND FOR?
- CONFIGURATION DATA MANAGER
- WHO'S RESPONSIBILITY IS TO DEVELOP AND IMPLEMENT THE OVERALL POLICY GOVERNING MANAGEMENT OF THE SHIPS 3-M SYSTEM, ITS DEVELOPMENT, COORDINATION AND MAINTENANCE?
- CNO (CHIEF OF NAVAL OPERATIONS)
- WHO ENSURES THE QUALITY, COMPLETENESS, AND TIMELY SUBMISSION NECESSARY SKILLS TO ADMINISTER THE PROGRAM?
- FLEET COMMANDERS
- WHO IMPLEMENT, MANAGE, COORDINATE AND MAINTAIN THE SHIPS 3-M SYSTEM PROGRAM FOR ALL SHIPS AND COMMANDS UNDER ITS COGNIZANCE?
- COMMANDER FLEET FORCES COMMAND (CFFC)
- WHO CONDUCTS APPROPRIATE REVIEW OF CASUALTY REPORTS, SAFETY ADVISORY AND MISHAP REPORTS, AND MATERIAL INSPECTION?
- TYPE COMMANDERS (TYCOM)
- WHO MANAGE AND DIRECT THE DEVELOPMENT, IMPLEMENTATION, OPERATIONAL MAINTENANCE AND IMPROVEMENTS OF ALL ASPECTS FO THE SHIPS 3-M SYSTEM THROUGHOUT THE NAVY, BOTH PMS AND MDS?
- NAVAL SEA SYSTEMS COMMAND (NAVSEASYSCOM)
- WHO PROVIDE GUIDANCE TO PMS DEVELOPERS TO ENSURE COMPLIANCE WITH THE 3-M MANUAL?
- REGIONAL MAINTENANCE CENTERS (RMC)
- WHO ENSURE APPROPRIATE PMS PACKAGES ARE DELIVERED SIMULTANEOUSLY WITH EQUIPMENT, ENSURE PACKAGES ARE DELIVERED TO THE RMC's FOR INCLUSION IN THE MASTER DATA FILE?
- SYSCOM/BUMED
- WHO ACTS AS A FINAL REVIEW OFFICERS FOR MAINTENANCE RESPONSIBILITY SHIFTS BETWEEN DEPARTMENTS?
- EXECUTIVE OFFICER
- WHO DETERMINES INACTIVE EQUIPMENT EQUIPMENT MAINTENANCE (IEM) STATUS?
- DEPARTMENT HEAD
- WHO REVIEW AND APPROVE QUARTERLY SCHEDULES AND ENSURE THE DIVISIONAL QUARTERLY SCHEDULES UPDATED WEEKLY?
- DIVISION OFFICER
- WHO SCHEDULES WEEKLY WORK CENTER MAINTENANCE AND SUPERVISE ITS PROPER ACCOMPLISHMENT?
- WORK CENTER SUPERVISOR
- THE DATE ON THE LOEP IS WRITTEN ON THE CHANGE PAGE UNDER WHAT COLUMN?
- DATE OF CHANGE
- WHAT IDENTIFIES THE RECOMMENDED SKILL LEVEL OF THE PERSON CONSIDERED CAPABLE OF PERFOMING THE MAINTENANCE REQUIREMENTS QUALIFIED PERSONNLE OTHER THAN THE RATE SPECIFIED MAY BE ASSIGNED?
- RATE (SKILL LEVEL)
- THE AVERAGE TIME, PER EQUIPMENT, PER PERSON, NEEDED TO PERFORM THE MAINTENANCE REQUIREMENTS?
- MAN HOURS
- MAINTENANCE REQUIREMENTS THAT MUST BE ACCOMPLISHED CONCURRENTLY WITH ANOTHER MAINTENANCE REQUIREMENTS. (# SYMBOL) i.e. M-3#
- MANDATORY RELATED MAINTENANCE
- WHAT CODES THAT ARE USED WHEN CONFIGURATIONS OR UTILITY DIFFERENCES OF A PERMANENT NATURE EXIST BETWEEN INSTALLATIONS OF THE SAME SYSTEM OR EQUIPMENT?
-
DUAL PERIODICITY CODE
A DUAL PERIODICITY MAY BE ASSIGNED IF NO OTHER ASPECT OF THE MRC REQUIRES MODIFICATION TO FIT BOTH PERIODICITIES. A NOTE ON THE MIP AND MRC WILL SPECIFY WHICH PERIODICITY CODE TO SCHEDULE. - WHAT CONTAINS THE NUMBER OF TAGS REQUIRED, LOCATION OF TAGS, POSITION OF THE TAGGED ITEM AND PERMISSION OR NOTIFICATION REQUIREMENT?
- TAG GUIDE LIST
- WHO MAY SUBSTITUTE TOOLS ONLY WITHOUT CHANGING THE MRC?
- WORK CENTER SUPERVISOR
- IN THE "______" BLOCK, WCS MAY LINE OUT "IF APPLICABLE" OR A NOTE IDENTIFYING STEPS TO BE OMITTED WITHOUT SUBMISSION OF A FBR.
- PROCEDURE
- IT WAS DESIGNED TO MANAGE PMS SCHEDULE.
- SKED PROGRAM
- WHAT LOG CONSIST OF THE LAST 13 COMPLETED WEEKS OF MAINTENANCE AND THE CONSURRENT WEEK?
- 13 WEEK ACCOUNTABILITY LOG
- WHAT SIGN INDICATES HIGHER LEVEL TEST REQUIRED?
- THE CENT SIGN
- WHAT DETERMINES CERTAIN MAINTENANCE REQUIREMENTS ARE NOT APPLICABLE TO EQUIPMENT/SYSTEMS.
- SCHEDULING AID