This site is 100% ad supported. Please add an exception to adblock for this site.

navseainst 4790.8

Terms

undefined, object
copy deck
who is overall responsible for ships maintenance?
1. CO
2. XO
3. 3M coordinator
4. person performing maintenance
1. CO
who is the 3M manager?
1. CO
2. XO
3. Dept Head
4. 3M coordinator
2. XO
Who approves the division quarter board?
1. XO
2. Dept Head
3. Divo
4. Work Center supervisor
3. Divo
what does a dash (-) on the LOEP on the new force revision annotates?
1. change to the LOEP line entry
2. change on the MIP
3. needs review
4. discrepancies on the LOEP have been noticed
2. change on the MIP
what does a slash (/)on the LOEP indicate
1. change to the LOEP line entry
2. change on the MIP
3. needs review
4. discrepancies on the LOEP have been noticed
1. change to the LOEP line entry
manditory required maintenance is identified by what symbol?
1. =
2. -
3. #
4. +
3. #
who maintains the PMS master file?
1. xo
2. divo
3. 3m coordinator
4. lcpo
3. 3m coordinator
what provides detailed percedures for performing maintenace requirements to a particular work center?
1. MIP
2. LOEP
3. MRC
4. Navseainst 4790.8
3. MRC
* asterick following the periodicity code indicates what?
1. correction to MRC is needed
2. safety of ship item
3. divo approval
4. 3m coordinator approval
2.
2. safety of ship item
what must be done if changes to a mrc is required or questions about the information on a mrc?
1. contact the 3m coordinator
2. contact the work center supervisor
3. submit a feedback report
4. enform the 3m manager
3. submit a feedback report
who signs and approves the cycle board?
1. xo
2. dept head
3. 3m coordinator
4. LCPO
2. dept head
when issues come up while performing pms who should be notified?
1. 3m manager
2. 3m coordinator
3. lcpo
4. work center supervisor
4. work center supervisor
a PMS FBR (feedback report) is used to notify who?
1. CO
2. XO
3. 3m manager
4. FTSCLANT/FTSCPAC
4. FTSCLANT/FTSCPAC
how many different types of FBR are there?
1. 1
2. 2
3. 3
4. 4
3. 3
category a
category b
urgent
which type of FBR may requires FTSCLANT/FTSCPAC for resolution?
1. category a
2. category b
3. urgent
2. category b
what FBR category is for the replacement of missing classified MIP/MRC?
1. category a
2. category b
3. urgent
1. category a
what FBR category requires a message for a response?
1. category a
2. category b
3. urgent
3. urgent
PMS revision packages will be addressed "attention" to who?
1. co
2. 3m manager
3. 3m coordinator
4. ship work center supervisor
3. 3m coordinator
the first force revision of 2006 is identified how?
1. 1/2006
2. 1-06
3. 06-1
4. 2006/1
2. 1-06
force revision are usually effective when?
1. first monday of the quarter
2. last sunday of the quarter
3. friday prior to the quarter
4. the middle of the week
1. first monday of the quarter
maintenace for inactive equipment is group in how many categories?
1. 1
2. 2
3. 3
4. 4
4. 4
lay up
preventive maintenace
start up maintenace
operational test

Deck Info

21

permalink