- What does SS stand for?
- Sustainable Sites
- What is the SS prerequisite?
- Erosion and sedimentation control.
- What is the intent of the SS prerequisite?
- Reduce negative impacts on water and air quality.
- What documents define best management practices?
- EPA Storm Water Management for Construction Activities, EPA Document No. EPA-832/R-92-005,(September 1992) Storm Water Management for Construction Activities, Chapter 3, OR local Erosion and Sedimentation Control codes if they meet/ exceed EPA protocols
- An erosion and sedimentation control plan must meet what objectives?
- Prevent loss of soil during construction. Prevent sedimentation of storm sewer or receiving streams. Prevent polluting the air with dust and particulate matter.
- What are strategies that might be incorporated into a site erosion and sedimentation control plan?
- Seeding; mulching; earth dikes; silt fencing; sediment traps; sediment basins.
- What is SS Credit 1 called?
- Site Selection
- What is the intent of the Site Selection Credit?
- Avoid development of inappropriate sites and reduce the environmental impact.
- What are some strategies to consider to minimize site disruption?
- Stacking the building program, tuck-under parking, share facilities with neighbors.
- How many points are available for Site Selection?
- One
- What are some characteristics of sites inappropriate for sustainable development?
- Elevation lower than five feet above the 100-year flood; habitat for threatened or endangered species; within 100 feet of a wetland; previously public parkland.
- What is SS Credit 2 called?
- Development Density
- What is the intent of the Development Density Credit?
- Channel development to urban areas with existing infrastructures.
- How many points are available for Development Density
- One
- What minimum site density determines that a site will qualify as Development Density?
- 60,000 SF per acre (roughly equivalent to 2-story downtown development)
- What is SS Credit 3 called?
- Redevelopment of Contaminated Sites
- What is the intent of the Redevelopment of Contaminated Sites Credit?
- Rehabilitate damaged sites where environmental development is complicated by environmental contamination, reducing pressure on undeveloped land.
- How many points are available for Redevelopment of Contaminated Sites?
- One
- What is required for Redevelopment of Contaminated Sites Credit?
- Develop on a contaminated site and provide remediation as required by Provincial Contaminated Sites Program
- What agencies can classify a site as a Redevelopment of Contaminated Sites?
- A local, provincial or federal regulatory agency.
- What determines Brownfield redevelopment procedures?
- The Canadian Council of Ministers of the Environment
- What submittals are needed to attain credit for Brownfield Redevelopment?
- Letter from local regulatory agency or CCME confirming Brownfield site classification; LEED Letter Template signed by civil engineer or the responsible party declaring the existing damage on site and the remediation has been performed.
- What is SS Credit 4 called?
- Alternative Transportation
- What is the intent of the Alternative Transportation Credit?
- Reduce pollution and land development impacts from automobile use.
- How many points are available for Alternative Transportation?
- Four
- What is required for Alternative Transportation Credit 4.1?
- Locate building within 1/2 mile from commuter rail, light rail, or subway station OR 1/4 mile from two or more bus lines.
- What is required for Alternative Transportation Credit 4.2?
- Provide secure bicycle storage and changing/shower facilities (within 200 yards of the Building) for cyclists, for 5% or more of regular building occupants in commercial and 15% in residential buildings.
- What is required for Alternative Transportation Credit 4.3?
- Provide alternative fuel vehicles for 3% of building occupants AND preferred parking for these vehicles, OR install alternative-fuel refueling stations for 3% of the total vehicle parking capacity of the site.
- What determines the maximum number of parking spaces allowed under Alternative Transportation Credit 4.4?
- No more than the MINIMUM local zoning requirements, AND provide preferred parking for carpools or vanpools capable of serving 10% of the building occupants.
- In rehabilitation projects, what parking requirements need to be followed to receive Alternative Transportation Credit 4.4?
- Add no new parking for rehabilitation projects AND provide preferred parking for carpools or vanpools capable of serving 10% of the building occupants.
- What is SS Credit 5 called?
- Reduced Site Disturbance
- What is the intent of the Reduced Site Disturbance Credit?
- Conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity.
- How many points are available for Reduced Site Disturbance?
- Two
- What is required on Greenfield sites for Reduced Site Disturbance Credit 5.1?
- Limit site disturbance to 40 feet beyond the building perimeter; 5 feet beyond primary roadway curbs; 25 feet beyond constructed areas with permeable surfaces.
- What is required on previously developed sites for Reduced Site Disturbance Credit 5.1?
- Restore a minimum of 50% of the site area by replacing impervious surfaces with native or adapted vegetation.
- What is required for Reduced Site Disturbance Credit 5.2?
- Reduce the development footprint to exceed the local zoning’s open space requirement for the site by 25%. For areas that have no local zoning requirements designate open space area adjacent to the building that is equal to the development footprint.
- What is SS Credit 6 called?
- Storm water Management
- What is the intent of the Storm water Management Credit?
- Limit disruption and pollution of natural water flows by managing storm water runoff.
- How many points are available for Storm water Management?
- Two
- What is required for Storm water Management Credit 6.1- if existing imperviousness is less than or equal to 50%?
- Implement a storm water management plan that prevents the post-development 1.5 year, 24 hour peak discharge rate from exceeding the predevelopment 1.5 year 24 hour peak rate.
- What is required for Storm water Management Credit 6.1- if existing imperviousness is greater than 50%?
- Implement a storm water management plan that results in a 25% decrease in the rate and quantity of storm water runoff.
- In Storm water Management credit 6.1, what are potential strategies for managing storm water flows
- Design the project site to maintain natural storm water flows by promoting infiltration. Specify garden roofs and pervious paving to minimize impervious surfaces. Reuse storm water volumes generated for non-potable uses such as landscape irrigation.
- What is required for Storm water Management Credit 6.2?
- Remove 80% of the average annual post development total suspended solids (TSS) and 40% of the average annual post-development of total phosphorous (TP)
- What document describes the practices to be used to reduce storm water TSS and TP?
- EPA's Guidance Specifying Management Measures for Sources of Non-Point Pollution in Coastal Waters, January 1993 (Document #EPA 840-B-92-002)
- What is SS Credit 7 called?
- Heat Island Effect
- What is the intent of the Heat Island Effect Credit?
- Reduce heat islands to minimize impact on microclimate and human and wildlife habitat
- How many points are available for Heat Island Effect?
- Two
- How much time is allowed for the growth of shade provided plantings, to meet the minimum standard to reduce non-roof heat islands in the Heat Island Effect: Non-Roof Credit 7.1?
- 5 years
- What are the five alternatives to reduce non-roof heat island effects in Heat Island Effect: Non-Roof Credit 7.1?
- Shade 30% of non-roof, impervious surfaces; open-grid pave 30% of non-roof, impervious surfaces use light-colored, high-albedo materials for 30% of the site's non-roof impervious surfaces; 50% of parking underground; open-grid pavement system for 50% of parking.
- What reflectance and emissivity standards and characteristics are required for roofing under Heat Island Effect: Roof Credit 7.2?
- Use Energy Star® compliant and high emissivity roofing at least0.9 when tested in accordance with ASTM 408).
- What percentage of a roof's surface area must meet the defined performance criteria for Heat Island Effect: Roof Credit 7.2?
- Minimum of 75% of the roof surface OR install a green roof for at least 50% of the roof area. Combinations of high albedo and vegetated roof can be used providing they collectively cover 75%of the roof area.
- What is SS Credit 8 called?
- Light Pollution Reduction
- What is the intent of the Light Pollution Reduction Credit?
- Eliminate light trespass from the site, improve night sky access, and reduce development impact on nocturnal environments.
- How many points are available for Light Pollution Reduction?
- One
- What is required for Light Pollution Reduction Credit 8.0?
- Meet or provide lower light levels than those recommended by the Illuminating Engineering Society of North America (IESNA) Recommended Practice Manual: Lighting for Exterior Environments(RP-33-99).
- What does WE stand for?
- Water Efficiency
- What is WE Credit 1 called?
- Water Efficient Landscaping
- What is the intent of Water Efficient Landscape Credit?
- Limit or eliminate use of potable water for landscape irrigation.
- How many points are available for Water Efficient Landscaping?
- Two
- What is required for Water Efficient Landscape Credit 1.1?
- To reduce site water consumption for irrigation by 50%
- What percent of potable water needs to be reduced to get Water Efficient Landscape Credit 1.1?
- 50% reduction over conventional means.
- What is required for Water Efficient Landscape Credit 1.2?
- Use only captured rain or recycled site water OR do not install permanent landscape irrigation systems.
- What percent of potable water needs to be reduced to get Water Efficient Landscape Credit 1.2?
- Potable Free System: 50% additional reduction (100% total reduction).
- What are 2 strategies for Water Efficient Landscape Credits?
- Design landscape with indigenous plants; Use high efficiency irrigation systems
- What is WE Credit 2 called?
- Innovative Wastewater Technologies
- What is intent of Innovative Wastewater Technologies Credit?
- Reduce generation of wastewater and potable water demand while increasing local aquifer recharge.
- How many points are available for Innovative Wastewater Technologies?
- One
- What is required for Innovative Wastewater Technologies Credit 2.0?
- Reduce use of municipally provided potable water for building sewage by at least 50% OR treat 100% of wastewater on site to tertiary levels.
- What are 2 examples of Innovative Wastewater Technologies?
- Change 50% of urinals & toilets to composting toilets and waterless urinals; Reuse storm water or greywater for sewage conveyance.
- What is WE Credit 3 called?
- Water Use Reduction
- What is intent of the Water Use Reduction Credit?
- Maximize water efficiency to reduce the burden on municipal water supply.
- How many points are available for Water Use Reduction?
- Two
- What is required for Water Use Reduction Credit 3.1?
- Employ strategies that use 20% less water than baseline calculated for building.
- What is required for Water Use Reduction Credit 3.2?
- Employ strategies that use 30% less water than baseline calculated for building.
- What total efficiency percent increase is needed to earn Credit 3.2?
- 30%
- What must be calculated before employing any strategy?
- Estimate water needs (identify number of building occupants).
- What are some technologies that reduce water demand?
- High efficiency fixtures, dry fixtures, and occupant sensors.
- What strategy can be used to reduce water demand?
- Reuse of storm water and greywater for non-potable applications.
- What are non-potable applications where water demand can be reduced?
- Toilet flushing, mechanical systems, and custodial uses.
- What does EA stand for?
- Energy and Atmosphere
- How many prerequisites and credits are there in the energy and atmosphere section?
- 3 prerequisites, 6 credits
- What is the name of the first prerequisites?
- Fundamental Building System Commissioning
- What is the intent of the 1st prerequisite?
- Verify that fundamental building elements and systems operate as intended.
- What are the fundamental best practice commissioning procedures?
- Engage commissioning authority; review design intent and documentation; include commissioning requirements in construction documents; use commissioning plan; verify installation, performance, training and documentation; complete commissioning report.
- What is a strategy to achieve EA Prerequisite 1?
- Engage a commisioning authority and adopt a commissioning plan.
- What is the name of the 2nd prerequisite?
- Minimum Energy Performance
- What is the intent of the 2nd prerequisite?
- Establish the minimum level of energy efficiency.
- Which standard must be met to meet this prerequisite?
- ASHRAE/IESNA Standard 90.1-1999 OR the MNECB 1997 by National Resources Canada CBIP
- What is a strategy to achieve EA Prerequisite 2?
- Design the building envelope and systems to maximize performance.
- What is the name of the 3rd prerequisite?
- CFC Reduction in HVAC&R Equipment
- What is the intent of the 3rd prerequisite?
- Reduce ozone depletion.
- Does EA Prerequisite 3 allow any use of CFC-based refrigerants in new HVAC&R systems?
- No
- Does EA Prerequisite 3 allow any use of CFC-based refrigerants in existing base building HVAC&R systems?
- Yes, but you must complete a comprehensive CFC phase-out conversion plan.
- What is EA Credit 1 called?
- Optimize Energy Performance
- How many points are available for Optimize Energy Performance?
- Ten
- What is the intent of Optimize Energy Performance Credit?
- Achieve increasing levels of energy performance.
- What standard is used as a baseline for Optimize Energy Performance Credit?
- ASHRAE/IESNA Standard 90.1-1999 OR the MNECB 1997 by National Resources Canada CBIP
- What metric is used when evaluating Optimize Energy Performance Credit?
- Cost
- What method is used to determine cost savings in Optimize Energy Performance Credit?
- Energy Cost Budget Method (whole building simulation).
- What are the regulated energy components for Optimize Energy Performance Credit?
- HVAC systems, building envelope, service hot water systems, and interior lighting.
- How much must you reduce energy design cost for a new and existing buildings to get two points for the Optimize Energy Performance Credit 1.1?
- For AHSHRAE: 20% for new, 10% for existing. For MNEBC: 29% for new, 20% for existing.
- How much must you reduce energy design cost for a new and existing buildings to get all ten points for the Optimize Energy Performance Credit 1.1?
- For AHSHRAE: 60% for new, 50% for existing. For MNEBC: 64% for new, 55% for existing.
- What is the EA Credit 2 called?
- Renewable Energy
- What is the intent of Renewable Energy Credit?
- Encourage and recognize increasing levels of on-site renewable energy,help to reduce environmental impacts associated with fossil fuel energy use.
- How many points are available for Renewable Energy?
- Three
- What is the requirement for Renewable Energy Credit 2.1?
- 5% of total energy load cost in renewables.
- What is the requirement for Renewable Energy Credit 2.2?
- 10% of total energy load cost in renewables.
- What is the requirement for Renewable Energy Credit 2.3?
- 20% of total energy load cost in renewables.
- What are some renewable technologies to achieve EA Credit 2?
- Solar, wind, geothermal, biomass, hydro and bio-gas.
- What is EA Credit 3 called?
- Best Practices Commissioning
- What is the intent of Additional Commissioning Credit?
- Ensure entire building designed, constructed, and calibrated to operate as intended.
- What is the difference between Prerequisite 1 and Credit 3?
- Prerequisite 1 is for "fundamental building", Credit 3 is for "entire building."
- How many points are available for Additional Commissioning?
- One
- What is the 1st requirement of Additional Commissioning Credit?
- 1) A commissioning authority, independent of the design team, shall review design prior to the construction document phase.
- What is the 2nd requirement of Additional Commissioning Credit?
- 2) An independent commissioning authority shall review construction documents when close to completion.
- What is the 3rd requirement of Additional Commissioning Credit?
- 3) An independent commissioning authority shall review the contractor submittals relative tosystems being commissioned.
- What is the 4th requirement of Additional Commissioning Credit?
- 4) provide the owner with a single manual that contains the information required for recommissioning building systems.
- What is the 5th requirement of Additional Commissioning Credit?
- Have a contract in place to review building operation with O&M staff, including ⬢ a plan for resolution of outstanding commissioning-related issues within one year after construction completion date. ⬢ A plan for reporting and investigation of IAQ concerns
- What is EA Credit 4 called?
- Ozone Protection
- What are 2 intents of the Ozone Protection Credit?
- Reduce ozone depletion and support compliance with the Montreal Protocol.
- How many points are available for Ozone Protection?
- One
- What is required for the Ozone Protection Credit?
- Install base building level HVAC, refrigeration equipment that do not contain HCFC’s or Halons.
- What are some strategies to achieve the Ozone Protection Credit?
- Building reuse: replace building systems that contain HCFCs or Halons; new buildings: specify refrigeration and fire suppression systems that use no HCFCs or Halons.
- What is EA Credit 5 called?
- Measurement & Verification
- What is the intent of Measurement & Verification Credit?
- Accountability and optimization of building energy and water consumption.
- How many points are available for Measurement & Verification?
- One
- What is the framework used for Measurement & Verification?
- Option B,C or D of the2001 International Performance Measurement & Verification Protocol (IPMVP) Volume I: Concepts and Options for Determining Energy and Water Savings.
- What energy & water systems are included in the Measurement & Verification Credit?
- Lighting systems & controls, constant and variable motor loads, variable frequency drive operation, chiller efficiency at variable loads, cooling load, air and water economizer, air distribution static pressures,boiler, indoor water risers, outdoor irrigation.
- What are some strategies to achieve the Measurement & Verification Credit?
- Model energy & water to predict savings. Design with equipment that measure energy & water
- What is EA Credit 6 called?
- Green Power
- What is the intent of the Green Power Credit?
- Encourage the development and use of grid-source energy technologies on a net zero pollution basis
- How many points are available for the Green Power?
- One
- What framework does the Green Power credit use?
- Center for Resource Solutions (CRS) EcoLogo products certification requirements.
- What can Green Power be derived from?
- Solar, wind, geothermal, biomass, or low impact hydro sources.
- 3 flying building systems commissioners were minding energy performance, while cfc's escaped from the HVAC system.
- 3 prerequisites, Fundamental Building Systems Commissioning, Minimum Energy Performance, CFC Reduction in HVAC&R Equipment .
- 6 oem pa loompas, re, act, oddly when they measure and verify green power
- 6 credits, Optimize Energy Performance, Renewable Energy, Additional commissioning, ozone depletion, measurement and verification, green power.
- Tent the 3 wives and the 4 little ones
- 10,3,1,1,1,1
- What does MR stand for?
- Materials & Resources
- What is the MR prerequisite?
- Storage and collection of recyclables.
- What is the intent of the MR prerequisite?
- Reduction in landfill.
- What items must be recycled at minimum?
- Paper, corrugated cardboard, glass, plastics, and metals.
- What is MR Credit 1 called?
- Building Reuse
- What are 5 intents of Building Reuse Credit?
- Extend existing stock, conserve resources, retain cultural resources, reduce waste, reduce environmental impacts.
- How many points are available for Building Reuse?
- Three
- What is the minimum level requirement available for Building Reuse?
- 75% of structure and shell reused.
- How is structure and shell defined for Building Reuse?
- Exterior skin and framing.
- What is excluded for structure and shell for reuse of building?
- Window assemblies) and non-structural roofing materials (for energy efficiency
- What is required for Building Reuse Credit 1.2?
- 95% of structure and shell reused.
- What is required for Building Reuse Credit 1.3?
- 95% of structure and shell reused AND 50% of non-shell areas.
- How is nonshell defined for Building Reuse?
- Walls, doors, floor coverings, and ceiling systems.
- What does LEED prefer upgraded in Building Reuse credit?
- Upgrade windows, mechanical systems, and plumbing fixtures, HVAC Systems, insulation
- What is MR Credit 2 called?
- Construction Waste Management
- What are 2 intents of Construction Waste Management credits?
- Divert debris from landfill and redirect salvage and recyclables.
- How many points are available for Construction Waste Management?
- Two
- What is required for Construction Waste Management credits?
- Waste management plan, quantifying material diversion goals.
- How do you calculate the percentage of Construction Waste Management Credits?
- Calculations can be done by weight or volume, but must be consistent throughout.
- Do you need a plan for Construction Waste Management credits?
- Yes, required.
- Can you donate salvage materials to nonprofits?
- Yes, LEED even uses Habitat as example.
- What is required for Construction Waste Management Credit 2.1?
- Recycle or salvage 50%.
- What is required for Construction Waste Management Credit 2.2?
- Recycle or salvage 75%.
- What is a strategy for Waste Management credits?
- Designate a specific area on site for recycling and track efforts throughout the construction process.
- What is MR Credit 3 called?
- Resource Reuse
- What is intent of Resource Reuse credits?
- Extend life of materials reduces demand of virgin materials and reduces waste.
- How many points are available for Resource Reuse?
- Two
- What is required for Resource Reuse Credit 3.1?
- Specify 5% salvage or refurbished or reused materials.
- What is required for Resource Reuse Credit 3.2?
- Specify 10% salvage or refurbished or reused materials.
- Name some materials recommended for Resource Reuse?
- Beams, posts, paneling, doors and frames, cabinets, built-in furniture, brick and decorative items.
- What measure is used to calculate Resource Reuse credit?
- Percentage of total cost of building materials (not including labor and equipment).
- What is MR Credit 4 called?
- Recycled Content
- What are 2 intents of Recycled Content points?
- Increase demand for recycled content materials and reduce extraction for new materials.
- How many points are available for Recycled Content?
- Two
- What is required for Recycled Content Credit 4.1?
- Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the post-industrial content constitutes at least 7.5% of the total value of the materials in the project.
- What is required for Recycled Content Credit 4.2?
- Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the post-industrial content constitutes at least 15% of the total value of the materials in the project.
- What is post-consumer Recycled Content?
- Materials that are not byproducts of an industrial process, but rather, that have been collected after being used by consumers.
- What is post-industrial Recycled Content?
- Left over materials from industrial process (leftover fiber in paper making).
- What is a strategy for Recycled Content credits?
- Establish a project goal, identify material suppliers that can achieve this goal.
- What is MR Credit 5 called?
- Regional Materials
- How many points are available for Regional Materials?
- Two
- What are 3 intents of Regional Materials credit?
- Up demand for local products, reduce environmental impacts of transport and support local economies.
- What credit focuses on local economies?
- Regional Materials
- How does buying locally help the environment?
- Reduces transportation impacts (fossil fuels, etc.).
- How does buying locally help the economy?
- It supports local, often smaller, businesses.
- What is required for Local/Regional Materials Credit 5.1?
- Use a minimum of 10% of building materials and products that are 80% extracted, processed and manufactured regionally within a radius of 500 miles (or 1500 miles if they are shipped by rail or water).
- What is required for Local/Regional Materials Credit 5.2?
- Use a minimum of 20% of building materials and products that are 80% extracted, processed and manufactured regionally within a radius of 500 miles (or 1500 miles if they are shipped by rail or water)
- How is manufactured defined for Local/Regional Materials?
- Manufacturing refers to the final assembly of components into the building product that is furnished and installed by the tradesmen.
- What is MR Credit 6 called?
- Rapidly Renewable Materials
- What is intent of Rapidly Renewable Materials Credit?
- Reduce depletion of finite, raw or long-cycle renewables by using Rapidly Renewable Materials.
- What is an example of a long-cycle renewable?
- Trees
- How many points are available for Rapidly Renewable Materials?
- One
- What is required for Rapidly Renewable Materials Credit?
- Specify 5% Rapidly Renewable Materials.
- Name some Rapidly Renewable Materials?
- Bamboo flooring, wool carpet, strawboard, cotton batt insulation, linoleum flooring, poplar OSB, sunflower seed board, wheatgrass cabinetry.
- How does LEED define Rapidly Renewable?
- Planted or harvested within 10 year cycle.
- What is MR Credit 7 called?
- Certified Wood
- What is intent of the Certified Wood credit?
- Encourage environmentally responsible forest management.
- How many points are available for Certified Wood?
- One
- What is required for the Certified Wood Credit?
- Minimum of 50% of wood-based materials certified in accordance with the FSC Guidelines for wood building components.
- What is FSC?
- Forest Stewardship Council
- What does LEED recommend using Certified Wood for?
- Framing, flooring, finishes, & non-rented construction applications like bracing, concrete form work.
- Eligible for a point if only 2 of 4 pieces of wood in a building are Certified Wood?
- Yes
- Can SFI Certified Wood use count for LEED credit?
- No
- Does LEED mention chain of custody for Certified Wood?
- LEED specifically states that to achieve MR Credit 7, the FSC chain-of-custody certificate number must be provided.
- Can a building product achieve points in LEED?
- No, materials can only contribute to achieving points. LEED sets performance based requirements.
- Can my company or product be LEED certified?
- No, USGBC certifies buildings not companies or products.
- Who can certify my products or services?
- Scientific Certification Systems, FSC, Green Seal, Green Guard, Building Green, Energy Star.
- Can a company use the LEED logo to show it is green?
- No but you can use USGBC Member logo if you are a Member.
- What does the "E" stand for in IEQ?
- Environmental
- Name 2 prerequisites in the IEQ Section
- 1. Minimum Indoor Air Quality Performance 2. Environmental Tobacco Smoke Control
- What is the intent of Indoor Environmental Quality prerequisite 1?
- To prevent the development of indoor air quality problems and contribute to the well-being and comfort of its occupants.
- What standard sets the minimum for minimum IAQ performance?
- ASHRAE 62-2001
- What are the design strategies to address minimum IAQ performance?
- Identify potential IAQ problems on the site and locate air intakes away from contaminate sources.
- What does ETS mean?
- Environmental Tobacco Smoke
- What are 2 potential ETS requirements?
- 1. Prohibit smoking in building and near entry 2. Designated smoking room that effectively removes ETS from the building
- What is IEQ Credit 1 called?
- Carbon Dioxide Monitoring
- What is the intent of the Carbon Dioxide Monitoring Credit?
- Provide capacity for IAQ monitoring to sustain comfort and well being.
- How many points are available for Carbon Dioxide Monitoring?
- One
- What ASHRAE standard discusses CO2 and metabolic rates?
- ASHRAE 62-2001, Appendix A
- What is the strategy for CO2 monitoring?
- CO2 monitoring sensors in HVAC, integrated with the building automation system (BAS)
- What is IEQ Credit 2 called?
- Ventilation Effectiveness
- What is the intent of Ventilation Effectiveness Credit?
- Provide fresh air.
- How many points are available for Increase Ventilation Effectiveness?
- One
- What does the E stand for in (Eac) ventilation systems?
- Air change Effectiveness
- In Ventilation Effectiveness, what value should E be in mechanically ventilated spaces?
- Greater or equal to 0.9.
- In naturally ventilated spaces, what must be summarized in a table?
- Provides effective ventilation for 90% of each zone for at least 95% of hours of occupancy.
- What standard sets the E for mechanically ventilated buildings?
- ASHRAE 129-1997
- How do you design an envelope system to optimize E?
- Displacement ventilation, low velocity ventilation, plug flow ventilation, and operable windows.
- What is IEQ Credit 3 called?
- Construction IAQ Management Plan
- What is the intent of Construction IAQ Management Plan Credit?
- Prevent indoor air quality problems resulting from the construction/renovation process.
- How many points are available for Construction IAQ Management Plan?
- Two
- During construction, the IAQ Management Plan requires following what standards?
- SMACNA IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3.
- What are the requirements under Construction IAQ Management Plan?
- 1. Compliance with SMACNA 2. Protection of absorptive material from moisture damage and 3. Replace filtration before occupancy
- How long is the flush-out period in Credit EQ3.2
- 2 weeks (minimum).
- What is IEQ Credit 4 called?
- Low-Emitting Materials
- How many points are available for Low-Emitting Materials?
- Four
- What is the intent of Low-Emitting Materials Credit?
- Reduce the quantity of indoor air contaminants that are odorous or potentially irritating.
- What material does IEQ Credit 4.1 cover?
- Adhesives & sealants
- What is the standard for IEQ 4.1?
- Adhesives: South Coast Air quality Management District Rule #1168; Sealants: Bay Area Air Quality Management District Reg 8, Rule 51
- What material does IEQ Credit 4.2 cover?
- Paints & coatings
- What is the standard for IEQ 4.2?
- Green Seal's Standard GS-11
- What material does IEQ Credit 4.3 cover?
- Carpet systems
- What is the standard for IEQ 4.3?
- Carpet & Rug Institute Green Label IAQ Test Program
- What material does IEQ Credit 4.4 cover?
- Composite wood & agrifiber products
- What is the standard for IEQ 4.4?
- Products must contain no added urea-formaldehyde resins.
- What are the strategies to meet IEQ Credit 4?
- Specify low-VOC materials in construction documents. Ensure that VOC limits are clearly stated in each section where adhesives, sealants, paints, coatings, carpet, and composite wood systems are addressed.
- What is IEQ Credit 5 called?
- Indoor Chemical & Pollutant Source Control
- What is the intent of Indoor Chemical & Pollutant Source Control Credit?
- Avoid exposure to potentially hazardous chemicals that adversely impact air quality.
- How many points are available for Indoor Chemical & Pollutant Source Control?
- One
- What is the requirement of IEQ Credit 5?
- Minimize cross contamination of regularly occupied areas by chemical pollutants.
- What is required for Indoor Chemical & Pollutant Source Control Credit?
- Permanent entry way systems to capture dirt; provide areas with deck-to-deck partitions with separate outside exhausting; provide drains for appropriate disposal of liquid waste where needed; replace all filtration media immediately prior to occupancy.
- What are the strategies to meet IEQ Credit 5?
- Design separate exhaust and plumbing systems for rooms with contaminants to achieve physical isolation from the rest of the building; install permanent architectural entryway systems such as grills and grates.