This site is 100% ad supported. Please add an exception to adblock for this site.

NAMP 4790 CH 18

Terms

undefined, object
copy deck
What is the major responsibility of the Naval Supply System.
a. Track
b. Fix Problems
c. provide material
d. deliver
c. provide material
Name the levels of maintenance
O level - Organizational
I level - intermediate
D level - Depot
What does UMMIPS stand for
Urgent Material Movement and Issue Priority System
What does FAD stand for
Force activity Designator
What assigns the FAD to activities for dtermining priorities
UMMIPS
What astablishes the speed a requisition must be filled by supply
Priority
What six Principles must be followed to achieve success in the aviation 3M Program
1. close liason between supply & Maint
2. Material Managment
3. weekly meetings between O and I rep's to discuss NMCS/PMCS
4. Monthly meetings between O, I, and supply
5. use of managment techniqes and devices(files,listings & mini computers)
6. automated techniques adapted
What does ASDTPS stand for
aviation supply desktop procedures
What does MAG stand for
Marine Air group
Marine Corps ASDTPs were developed and have been implemented in all MAGs to ensure what?
a. standardization
b. Unity
c. understanding
d. cowoperation
a. standardization
Which programs control critical & costly repairable material used in support of aircraft maintenance?
a. OSI
b. IRIM
c. AVDLR'S
d. ATAC DLR'S
e. All the above
e. All the above
What does OSI stand for
Operational Support Inventory
What does IRIM stand for
Intensive Repairables Item Managment
What does AVDLR's stand for
Aviation Depot Level Repairables
What does ATAC stand for
Advanced Traceability and Control
Weapon systems are supported under what concept
a. OSI
b. IRIM
c. AVDLRs
d. ATAC DLR
a. OSI

*strict one for one echange
What program was astablished to standardize previosly existing programs to resolve troubled items?
a. OSI
b. IRIM
c. AVDLRs
d. ATAC DLR
b. IRIM
What does NWCF stand for
Navy Working Capital Fund
What program is financed under NWCF and paid for with AFM funds
a. OSI
b. IRIM
c. AVDLRs
d. ATAC DLR
c. AVDLRs
What does AFM stand for
Aviation Fleet Maintenance
What are some other benefits of the NWCF?
a. reduce back orders
b. Improve financial flexibility
c. Improve aircraft readiness
d. financial incentive to affect repair
What does RFI stand for
Ready for issue
What does BCM stand for
Beyond Capability of Maintenance
Would the standard price or net price be more
standard price
Would the Standard price or net price be charged for a RFI replacment of a NON-RFI asset that is BCM'd
Net price
Would the Standard price or net price be charged if requisitioner does not make a turn -in
Standard price
When is Total system carcass tracking implented
when a unit cannot be repaired locally and must be returned for repair at a D-level facility
What does CTR stand for
Carcass Tracking Records
Item on CTR is not closed out what ICP follow up action is initiated?
a. BK1
b. BK2
c. BK3
d. BK4
a. BK1
Item on CTR is not closed out, ICP submitted follow up action, what does the activity use to reply?
a. BK1
b. BK2
c. BK3
d. BK4
b. BK2
Item on CTR is not closed out, ICP submitted follow up action, activity replyied, but it was not an acceptable reply, ICP sends a ?
a. BK1
b. BK2
c. BK3
d. BK4
c. BK3

notification of additional billing.
*difference between the net and standard price
Item on CTR is not closed out, ICP submitted follow up action, activity replyied, reply was not an acceptable, ICP sends new charge to activity, activity found subsequent proof of the turn in, under what code will it be submitted to the ICP?
a. BK1
b. BK2
Item on CTR is not closed out, ICP submitted follow up action, activity replyied, reply was not an acceptable, ICP sends new charge to activity, activity found subsequent proof of the turn in, proof is acceptable to ICP What code is sent out to initiate
d. BK4
What program was established to improve accountability, traceability, and customer billing accurace in the DLR carcass tracking system.
a. OSI
b. IRIM
c. AVDLR
d. ATAC
d. ATAC
What does CRIPL stand for
Consolidated Remain in Place
Name 3 IMA responsibilities
1. Proper managment of Asset inventory.
2. Proper financial Managment of repairables
3. Accurate determination of allowances, Timely turn-in of retrogrades, and productive communication and coordination
Name the eight responsibilities of Supply Department
1. Maintain OSI
2. Maintain assets carried in local stocks
3. Record demand, replenish and adjust accordingly
4. Perform Technical Reserch
5. Provise NMCS/PMCS report daily
6. Provide AWP reports weekly
7. Validate NMCS/PMCS daily and AWP weekly
8. Establish, maintain, and replinish PEB's
The 4 Maintenance Department responsibilities
a. Initiate requests for material
b. Provied supply with a PN, cage, tech ref, proj/pri
c. tech assistance
d. Scheduled monthly meetings
Supply maintains telecommunications with ICP how?
a. autodin and T35
b. T35 and phone
c. Salts, autodin, and T35
d. phone line and autodin
c. Salts, autodin, and T35
Which communication is used from a Marine establishment to supply
a. AUTODIN
b. T35
c. SALTS
d. Phone
b. T35
Explain Material reporting
is a procedure where all supply action documents in support of maintenance are entered and merged with the material reporting history file for reporting to COMAVAIRSYSCOM
In material reporting, each type of supply action document is identified by what?
RECTYP (Record Types)
Define
RECTYP 60
material Issue for a weapon system.
Define
RECTYP 61
RFI component from IMA
Define
RECTYP 62
deletion of previously submitted RECTYP
Define
RECTYP 63
non-RFI component from IMA
Define
RECTYP 64
material issue for TD compliance
Define
RECTYP 65
material issue to fill initial allowance
Define
RECTYP 66
material issue from SERVMART/MINIMART (Money value only be TEC)
Define
RECTYP 67
material issue to PEBs and for indirect material requirments.
What are the name of the two Local material reports provided for repairables management and allowance determination?
a. MR-1-1 MR-2-1
b. MR-1-1 MR-1-2
c. MR-2-1 MR-3-1
d. MR-2-1 MR-2-2
b. MR-1-1 MR-1-2
What reports merge supply and maintenance data elements to determine usage and TAT of repairables?
MR-1-1 and MR-1-2
What are the name of the three Expence item management data reports that are provided for reviewing consumables?
a. MR-1-1 MR-2-1 MR-3-1
b. MR-1-1 MR-1-2 MR-1-3
c. MR-2-1 MR-3-1 MR-4-1
d. MR-2-1 MR-2-2 MR-2-3
d. MR-2-1 MR-2-2 MR-2-3
All requisitions for DLR will be submitted to the supply systemusing advice code? _ series card column 65-66
5
What are established and maintained to provide a retail outlet for administrative and housekeeping nature
SERVMART/MINIMART
Integrated material management is directly related to?
a. weapon support
b. supply
c. AIMD
d. Navy
weapon support
FEDLOG stands for
Federal Logistics
How many types of organizations are addressed in the H4/H8 Publication
Three
1.govern desigated activities
2. manufacturers
3. non-manufacturers
What pub tells the Contractors name, Cage, and status code
a. P-485
b. NAMP
c. SORM
d. H4/H8
d. H4/H8
What does JASMMM stand for
Joint Aviation Supply and Maintenance Material Management
Training is accomplished thru what three senarios
OJT
JASMMM
Fleet Assistance Team
ASD ORGANIZATION
Composed of two sections what are they?
SRS and CCS
An ASD officer is responsible to who
Supply Officer
Supply Response Standards
ASD will issue material or provide status within what standards?
Issue priority group 1
Issue priority group 2
Issue priority group 3
Iss pri group 1 - 1 hour
Iss pri group 2 - 2 hour
Iss pri group 3 - 3-24 hours
What does ICRL stand for
Individual Component Repair List
What does the ICRL tell you
is a detailed listing of IMA component repair capabilities
SRS is divided into how many sections? What are they
FIVE
a. RCU
b. TRU
c. MDU
d. PMU
e. PEB
What does RCU stand for
Requisition Control Unit
PMU stand for what
Program managment unit
What does AMRR stand for? who prepares the report
Aircraft Material Readiness Report
PMU
TRU stand for what
Technical reserch unit
MDU stands for what
material Delivery unit
PEB stands for
Pre extended bin
PEB stock is limited to maintenance related material having a minimum demand frequency of how many per month.
Three
Eligible items with a unit cost of ____ or less may be routinely established in pre expended stocks
$150
Eligible items with a unit cost in excess of $150 may be pre-expended with approval of who?
CO
CCS is divided into how many sections? what are they
FOUR
a. DCU
b. LRCA
c. SSU
d. AWP
DCU stands for
Document Control Unit
LRCA stands for what
Local Repair Cycle Asset
SSU stands for what
Supply Screening Unit
AWP stands for what
Awaiting parts
What are the Supply Response Standards with Priority Designators?
PRI GR PRI DES Processing
1
2
3
PRI GR PRI DES Processing
1 1-3 1 hour
2 4-8 2 hour
3 9-15 24 hour
What is the total average turn around time in LRCA limited to
20 Days

Deck Info

83

permalink